Why do we build on a concrete slab foundation?

2102
  • A reduced dig creates an internal floor to ceiling height of 2.15 metres.
  • There is no void under the building avoiding rodents and foxes.
  • No decking is required outside the room to cover the void area.
  • As there are no pockets of cold air under the building there is less heat loss.
  • More solid base equals more durable, we believe this is the best form of construction for a permanent building.
54321
(0 votes. Average 0 of 5)